DAILY UPDATES / JOURNEY

The development journey.

Continuous chronological updates tracking our propulsion test runs, student STEM workshops, prototype fabrications, and company milestones.

R&D update// Propulsion R&D
2026-08-15LOGGED BY: R&D Team

Green Propulsion Thruster Test Bench Setup

The R&D team initiated preliminary test fixture calibrations for sustainable non-toxic propellant injector configurations at our Coimbatore workshop.

Workshop// STEM Education
2026-07-28LOGGED BY: Joshva Muthukumar

Hands-On Rocketry & Avionics Workshop for Engineering Students

Conducted an intensive practical session covering model rocketry mechanics, sensor telemetry, and recovery parachute electronics with over 20 aspiring student engineers.

Prototype/Build update// Flight Dynamics
2026-07-10LOGGED BY: R&D Team

Reusable Rocket Descent Guidance Simulation Completed

Completed aerodynamic fin control algorithm simulations for vertical descent recovery phases under simulated atmospheric gust conditions.

R&D update// Space Systems
2026-06-22LOGGED BY: Baskaran Selvaraji

CubeSat Satellite Subsystem Design Architecture Review

Finalized modular EPS (Electrical Power System) and micro-thruster integration interface specifications for educational CubeSat platforms.

Team update// Milestone
2026-05-18LOGGED BY: Leadership Team

Spacemurak Aerospace R&D Team Expansion

Welcomed specialized student engineers and researchers into our rocketry, aerodynamics, and structural design sub-teams.

Prototype/Build update// Drone Solutions
2026-04-30LOGGED BY: Hardware Team

Custom Aerial Survey Drone Prototyping Milestone

Successfully assembled and conducted hover stability trials for our lightweight carbon-fiber inspection drone frame with custom telemetry logging.